💬

Complete WRA Permits Guide 2024: Step-by-Step Process

← Back to Blog

Getting your WRA water permit doesn't have to be confusing or time-consuming. This complete 2024 guide walks you through every step, from application to approval, with exact costs, timelines, and insider tips to get your permit approved quickly and correctly.

Why WRA Permits Matter (And What Happens If You Skip Them)

The Water Resources Authority (WRA) regulates all water abstraction in Kenya under the Water Act 2016. Whether you're drilling a borehole, abstracting from a river, or pumping from a spring, you MUST obtain a Water Permit before use.

⚠️ Consequences of Operating Without a Permit

  • Heavy Fines: Up to KSH 2,000,000 or 10 years imprisonment (or both!)
  • Borehole Closure: WRA can order immediate cessation of water abstraction
  • Equipment Seizure: Pumps and infrastructure can be confiscated
  • Legal Liability: Criminal charges under the Water Act 2016
  • No Resale Value: Properties with unpermitted boreholes lose market value
  • Bank Loan Rejection: Many banks refuse to finance properties with illegal water sources

✅ Benefits of Proper WRA Compliance

  • Legal Protection: Operate your borehole without fear of penalties
  • Property Value: Permitted boreholes add 15-25% to property value
  • Dispute Resolution: WRA mediates conflicts with neighbors over water rights
  • Access to Support: Eligible for government water conservation programs
  • Bankable Asset: Lenders accept permitted boreholes as collateral
  • Peace of Mind: Sleep well knowing you're 100% compliant

Complete Step-by-Step WRA Permit Process (2024)

1

Initial Application Submission

Your journey begins with submitting a formal application to the Water Resources Authority.

📄 Required Documents Checklist

Copy of National ID or Passport

For individuals. Companies submit Certificate of Incorporation + KRA PIN.

Title Deed or Lease Agreement

Proof of land ownership or legal occupancy rights. Must show the exact plot where borehole is located.

Completed WRA Application Form (WRA 2A)

Download from WRA website or pick up at regional offices. Must be fully completed and signed.

Drilling Completion Report

Provided by your drilling contractor. Includes borehole depth, yield, static water level, and geological log.

Pump Test Results

Documents sustainable yield (m³/day) and drawdown characteristics. Essential for determining permit allocation.

Water Quality Test Results

Laboratory analysis from KEBS-certified lab. Tests for pH, TDS, bacteria, nitrates, fluoride, etc.

Site Plan/Location Map

Shows borehole location relative to property boundaries, buildings, and neighboring properties.

Environmental Impact Assessment (EIA) License

Required for commercial/industrial use abstracting >50 m³/day. Not needed for domestic use.

💡 Where to Submit

  • WRA Regional Office: Rift Valley Region covers West Pokot (Nakuru headquarters)
  • Online Portal: www.wra.go.ke (e-Services section)
  • County Water Office: Some counties have WRA desks for document drop-off
Fee Item Cost (KSH)
Application Processing Fee 5,000
Site Inspection Fee 3,000
Step 1 Total 8,000

💡 Fancy Drops Pro Tip

Let us handle it! When you drill with Fancy Drops, we prepare ALL documentation, submit your application, and coordinate with WRA on your behalf. You simply sign where indicated—we do the rest. This typically saves clients 3-4 weeks of back-and-forth with WRA.

2

WRA Site Inspection

Within 2-3 weeks of application submission, WRA schedules a site inspection to verify:

  • Borehole location matches application details
  • Drilling was done professionally with proper casing
  • No environmental hazards (e.g., proximity to septic tanks, pollution sources)
  • Neighboring water sources won't be adversely affected
  • Water use aligns with stated purpose (domestic, commercial, irrigation, etc.)

📋 What Inspectors Check

  • Borehole Construction: Casing integrity, wellhead seal, sanitary protection
  • Pump Installation: Proper submersible pump setup with pressure gauge
  • Water Storage: Tank capacity, cleanliness, overflow management
  • Drainage: No stagnant water around wellhead (contamination risk)
  • Distance Compliance: Minimum 15m from septic tanks, 30m from pit latrines
  • Metering: Water meter installed for abstraction tracking (commercial use)

⚠️ Common Inspection Failures (And How to Avoid Them)

  • Issue: Missing wellhead seal → Fix: Install concrete apron around casing (2m radius)
  • Issue: No water meter → Fix: Install calibrated meter before inspection
  • Issue: Drainage problems → Fix: Create proper drainage channels away from wellhead
  • Issue: Incomplete documentation → Fix: Have drilling report, pump test data ready on-site
  • Issue: Proximity violations → Fix: Relocate borehole if too close to contamination sources (expensive!)

✅ Fancy Drops Pre-Inspection Service

We conduct a free pre-inspection 1 week before WRA visits. We identify and fix any compliance issues, ensuring you pass on the first try. Our clients have a 98% first-time pass rate vs. 65% industry average.

⏱️ Step 2 Timeline

Week 1
WRA schedules inspection (phone call/email notification)
Week 2-3
Site inspection conducted (1-2 hours on-site)
Week 3-4
Inspection report submitted to WRA HQ for review
3

Permit Issuance & Payment

Once your inspection passes, WRA issues a Water Permit Letter specifying:

  • Permitted Abstraction Volume: Maximum m³/day you can extract
  • Permit Duration: Usually 5 years (renewable)
  • Water Use Restrictions: Domestic, irrigation, commercial, industrial
  • Annual Tariff: Water Resource User Fee (varies by volume)
  • Compliance Conditions: Metering, reporting, conservation requirements

2024 WRA Permit Costs

Use Category Abstraction Volume Annual Permit Fee (KSH)
Domestic (Household) Up to 10 m³/day 2,000
Small-Scale Irrigation Up to 30 m³/day 5,000
Commercial (Hotels, Schools) 30-100 m³/day 15,000
Large-Scale Irrigation 100-500 m³/day 30,000
Industrial 500+ m³/day 50,000+
Typical Domestic Permit (5-Year Total) 10,000

💰 Payment Methods

  • Bank Deposit: Direct deposit to WRA account (KCB, Equity, Co-op Bank)
  • M-Pesa Paybill: Paybill No. 200200 (Account: Your Application No.)
  • Online Portal: Credit/debit card payment via WRA e-Services

Important: Retain payment receipts—you'll need them for annual renewals.

⏱️ Step 3 Timeline

Week 1-2
WRA issues permit approval letter via email/post
Week 2
Pay annual tariff (instructions in approval letter)
Week 3
Collect physical permit certificate from WRA office
4

Ongoing Compliance & Renewals

Your permit journey doesn't end at issuance! Annual compliance is mandatory to maintain valid permit status.

Annual Requirements:

📋 Yearly Compliance Checklist

Pay Annual Water Resource User Fee

Due every 12 months. Failure to pay = permit suspension.

Submit Abstraction Records

Monthly meter readings (commercial users). Quarterly reporting (domestic users).

Water Quality Testing (Annual)

Required for commercial/public use. Recommended for domestic (peace of mind).

Maintain Metering Equipment

Ensure water meter is functional and accurately recording abstraction.

5-Year Permit Renewal Process:

Permits expire after 5 years. Renewal process is simpler than initial application:

  • Submit Renewal Application: 3 months before expiry (WRA sends reminder)
  • Renewal Fee: KSH 3,000 processing + annual tariff
  • Site Re-Inspection: Only if significant changes occurred (new pump, increased usage)
  • Processing Time: 2-4 weeks (faster than initial application)

⚠️ Permit Suspension/Revocation Triggers

WRA can suspend or revoke your permit for:

  • Non-payment of annual fees for 2+ consecutive years
  • Exceeding permitted abstraction volumes
  • Failure to install/maintain metering equipment
  • Water pollution caused by improper borehole management
  • Selling water commercially without proper permit category
  • Obstructing WRA inspections or failing to provide records

✅ Fancy Drops Compliance Management Service

Never miss a deadline again! Our annual compliance package includes:

  • Automated renewal reminders (email + SMS)
  • Payment processing on your behalf
  • Quarterly meter reading submissions to WRA
  • Annual water quality testing coordination
  • Permit renewal application handling

Cost: KSH 3,000/year (saves you time and avoids penalties)

Total WRA Permit Cost Summary (5-Year Cycle)

Expense Category Year 1 (KSH) Years 2-5 (KSH/year) 5-Year Total (KSH)
Application Processing 5,000 0 5,000
Site Inspection 3,000 0 3,000
Annual Permit Fee (Domestic) 2,000 2,000 10,000
Water Quality Testing (Annual) 5,000 5,000 25,000
Documentation/Transport 3,000 500 5,000
Total 5-Year Compliance Cost (DIY) 48,000
With Fancy Drops Management Service 33,000

How we save you KSH 15,000: Bulk rates on water testing, direct WRA relationships (no transport costs), and efficient processing (no resubmission fees due to errors).

Common WRA Permit Mistakes (And How to Avoid Them)

❌ Mistake #1: Applying After Drilling Without Survey

Problem: Many people drill first, apply later—then discover their borehole is in a restricted zone or too close to neighboring boreholes.

Solution: ALWAYS conduct hydrogeological survey + WRA site assessment BEFORE drilling. Fancy Drops includes this in our drilling package.

❌ Mistake #2: Incomplete Documentation

Problem: Missing drilling reports, poor water quality data, or vague site maps lead to application rejection.

Solution: Use a certified drilling contractor (like Fancy Drops) who provides comprehensive, WRA-compliant documentation.

❌ Mistake #3: Ignoring Annual Compliance

Problem: Clients get permit, then forget about annual fees—permit gets suspended, requires costly reapplication.

Solution: Set calendar reminders OR use our compliance management service (we handle everything).

❌ Mistake #4: Wrong Permit Category

Problem: Applying for "domestic" permit but using water for commercial purposes (irrigation, water selling) = violations.

Solution: Be honest about water use. Commercial permits cost more but protect you legally.

❌ Mistake #5: No Water Meter Installation

Problem: WRA requires meters for abstraction tracking—no meter = inspection failure.

Solution: Install calibrated water meter during pump setup (Fancy Drops includes this automatically).

Full Timeline: Application to Approval

⏱️ Expected Duration: 6-10 Weeks

Week 1
Document preparation + application submission
Week 2-3
WRA application review + site inspection scheduling
Week 4-5
Site inspection conducted + report submission
Week 6-8
WRA HQ review + permit approval/denial decision
Week 9-10
Permit issuance + certificate collection

💡 Fast-Track Option

Fancy Drops Premium Service: Leveraging our WRA relationships and streamlined processes, we can reduce this timeline to 4-6 weeks in most cases. Costs KSH 5,000 extra but saves you 1-2 months of waiting.

📋 Let Us Handle Your WRA Permit (Stress-Free!)

Stop worrying about forms, inspections, and compliance deadlines. Fancy Drops manages the entire WRA process from application to renewal—you just enjoy your water supply.